Of course the tab will be picked up by the taxpayers of Portland. The very same people who pay for the parks and facilities these freeloading commie bastards destroy. This piece is from KGW:
The Portland Parks and Recreation Department released the following itemized list of repairs needed at Portland’s Plaza Blocks after Occupy Portland and the estimated costs:
General Park Repaint restroom interiors, exterior trim at Chapman and Lownsdale - $2,200
General Park Steam clean surfaces – restroom interiors, benches, poles - $3,000
Park Benches Replace 2 benches, repair 7 benches – $16,500
Bollards and chain Replace 5 bollards, one chain section - $4,000
Paths Power wash paths – $1,600
Restrooms Soda blast exteriors to remove graffiti - $1,100
Turf Rake to remove leaves and debris - $600
Turf Install erosion control- $1,000
Turf Winter – fill low areas, hydro mulch, lime, fertilize, seed, enzymes - $8,100
Turf Spring – fine grade, slice seed, top-dress – $3,800
Shrub beds Prune to correct damage, replace damaged plants, fertilize, mulch – $4,000
Trees Inspect, monitor tbd Trees Place soil to cover exposed roots - $750
Restrooms Chapman – Clean sewer, inspect, repair as needed – $600
Restrooms Chapman – repair sewer as needed (Potentially up to a $7,000) tbd
Restrooms Chapman – tile and grout repair- $700
Restrooms Chapman – Re-install door, jamb, and frame – $2,500
Restrooms Refurbish octagonal windows includes frames, re-glaze – $2,300
Restroom Lownsdale – Remove/ replace 3 destroyed toilets, one pedestal sink, repair plumbing in walls, wall mounted braces, floor attachments. – $28,000
Restroom Lownsdale – Repair door lock – $100
Restroom Lownsdale – Tile and grout repairs – $1,800
Art The Regional Arts & Culture Council (RACC) to assess, recommend, implement repairs (cost paid by RACC) tbd
Memorials RACC to assess, recommend, implement repairs (RACC cost) tbd Fencing Temporary fencing – $3,200
SUBTOTAL $ 85,850
